NTISthis.com

Evidence Guide: TLIB2082 - Repair steel structures

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIB2082 - Repair steel structures

What evidence can you provide to prove your understanding of each of the following citeria?

Determine job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Structures are inspected as required to locate defects

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job requirements are determined in accordance with workplace procedures, and scope of work and resources required are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare component for repair

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Components requiring repair are prepared in accordance with requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials required for job are identified and organised as required to enable appropriate repair of components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Surfaces of components are treated using appropriate methods and materials as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Components are assembled using appropriate lifting methods to ensure safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connection locations are checked for clearances and tolerances to allow smooth fitting of components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fastening of components is performed to specification as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform repairs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Steel members are accurately marked, drilled and cut in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Component is replaced or repaired to required standard in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replaced or repaired components are connected to the structure by approved methods in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connections between steel members are tightened, repaired or replaced using approved material and techniques

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

External steel deficiencies in components are treated with suitable materials as required to minimise degradation of components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace procedures and environmental regulations and standards relevant to site clean-up are confirmed and clarified as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Waste is minimised and reused or disposed of in accordance with relevant workplace procedures and environmental regulations and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cleaning products and materials are disposed of in accordance with relevant workplace procedures and environmental regulations and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Established site restoration practices are followed and problems with these practices are identified and reported

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required documentation procedures and processes are confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is filled in legibly and proofread

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is processed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine job requirements

1.1

Structures are inspected as required to locate defects

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Job requirements are determined in accordance with workplace procedures, and scope of work and resources required are identified

2

Prepare component for repair

2.1

Components requiring repair are prepared in accordance with requirements

2.2

Materials required for job are identified and organised as required to enable appropriate repair of components

2.3

Surfaces of components are treated using appropriate methods and materials as required

2.4

Components are assembled using appropriate lifting methods to ensure safety

2.5

Connection locations are checked for clearances and tolerances to allow smooth fitting of components

2.6

Fastening of components is performed to specification as required

3

Perform repairs

3.1

Steel members are accurately marked, drilled and cut in accordance with workplace procedures

3.2

Component is replaced or repaired to required standard in accordance with workplace procedures

3.3

Replaced or repaired components are connected to the structure by approved methods in accordance with workplace procedures

3.4

Connections between steel members are tightened, repaired or replaced using approved material and techniques

3.5

External steel deficiencies in components are treated with suitable materials as required to minimise degradation of components

4

Clean up site

4.1

Workplace procedures and environmental regulations and standards relevant to site clean-up are confirmed and clarified as required

4.2

Waste is minimised and reused or disposed of in accordance with relevant workplace procedures and environmental regulations and standards

4.3

Cleaning products and materials are disposed of in accordance with relevant workplace procedures and environmental regulations and standards

4.4

Established site restoration practices are followed and problems with these practices are identified and reported

5

Complete documentation

5.1

Required documentation procedures and processes are confirmed

5.2

Documentation is filled in legibly and proofread

5.3

Documentation is processed in accordance with workplace procedures

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine job requirements

1.1

Structures are inspected as required to locate defects

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Job requirements are determined in accordance with workplace procedures, and scope of work and resources required are identified

2

Prepare component for repair

2.1

Components requiring repair are prepared in accordance with requirements

2.2

Materials required for job are identified and organised as required to enable appropriate repair of components

2.3

Surfaces of components are treated using appropriate methods and materials as required

2.4

Components are assembled using appropriate lifting methods to ensure safety

2.5

Connection locations are checked for clearances and tolerances to allow smooth fitting of components

2.6

Fastening of components is performed to specification as required

3

Perform repairs

3.1

Steel members are accurately marked, drilled and cut in accordance with workplace procedures

3.2

Component is replaced or repaired to required standard in accordance with workplace procedures

3.3

Replaced or repaired components are connected to the structure by approved methods in accordance with workplace procedures

3.4

Connections between steel members are tightened, repaired or replaced using approved material and techniques

3.5

External steel deficiencies in components are treated with suitable materials as required to minimise degradation of components

4

Clean up site

4.1

Workplace procedures and environmental regulations and standards relevant to site clean-up are confirmed and clarified as required

4.2

Waste is minimised and reused or disposed of in accordance with relevant workplace procedures and environmental regulations and standards

4.3

Cleaning products and materials are disposed of in accordance with relevant workplace procedures and environmental regulations and standards

4.4

Established site restoration practices are followed and problems with these practices are identified and reported

5

Complete documentation

5.1

Required documentation procedures and processes are confirmed

5.2

Documentation is filled in legibly and proofread

5.3

Documentation is processed in accordance with workplace procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least three separate occasions and include:

adapting to differences in tools and equipment and work requirements in accordance with operating procedures

applying relevant workplace procedures

following operational instructions and work sequences when undertaking steel structures repair

identifying defects in accordance with workplace procedures

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

implementing contingency plans

modifying activities depending on operational contingencies, risk situations and environments

reading and interpreting relevant plans and specifications

repairing a range of defect types in accordance with workplace procedures

repairing existing steel structures using a range of repair techniques

replacing steel components in accordance with workplace procedures

reporting and/or rectifying identified problems, faults or malfunctions, in accordance with regulatory requirements and workplace procedures

selecting and using relevant tools and equipment in accordance with workplace procedures.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

basic steel component assembly techniques

functions of different types of steel structures

hazards that may exist when repairing structures and/or components and ways of controlling the risks involved

information on the use of epoxy and grouts for mortar pads in accordance with safety data sheets (SDSs)/material safety data sheets (MSDSs) and/or manufacturer instructions and organisational procedures

problems that may occur during the repair of steel structures and action that can be taken to report or resolve these problems

relevant rail danger zones

relevant recording and documentation procedures

relevant rail safety, work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

steel structures repair methods and techniques

workplace procedures for repairing steel structures.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.